HIGHLIGHTS of QUALIFICATIONS
EXPERIENCE
Smoot Construction Company
Columbus, OH Superintendent
June 2012 – December 2012 §
Assisted Project Management
Team in the planning and coordination of activities designated to ensure that
goals & objectives of project were accomplished within prescribed time
frames and within budget parameters §
Managed and assisted
subcontractors on meeting schedule objectives, acting as liaison to Owner /
Architect, problem solving on subcontractor issues, documenting progress to
project scheduler, and monitored /enforced subcontractor compliance of all
health and safety procedures §
Managed all reporting and
administrative requirements including coordinating and scheduling various
types of inspections, daily reporting, scheduling assessment, processing and
generation of RFI’s, purchase orders, and change orders §
Prepared, scheduled, and
supervised completion of various punch lists in order to maintain
overall project schedule Captive Aire Systems
Inc.
Westerville, OH Sales
Engineer
August 2011 – January
2012 § Designed and sold commercial ventilation equipment
and systems § Managed the coordination and procurement of all
manufacturer’s materials and equipment to multiple project locations § Performed test and balance evaluations on new &
existing kitchen ventilation systems to ensure proper airflow was exhausted,
and properly replenished § Assessed existing systems and created designs based
upon code requirements and client’s budgetary constraints § Provided technical support and oversight to field
personnel to ensure proper installation/functionality of equipment and
systems was achieved § Designed Fire Suppression Systems for commercial
kitchen ventilation systems § Commissioned HVAC systems and equipment Hubbard Construction
Company
Jacksonville, FL Project Engineer / Superintendent
June 2006 – August 2011 § Key member of management team for multiple
infrastructure /environmental construction projects that ranged from $25,000
to $65,000,000 § Proactively managed and controlled project schedule,
costs and budget (utilized various software to track quantities, production
and yield for a wide array of materials and operations. § Simultaneously coordinated and scheduled multiple
projects and operations; types of construction and operations
including but certainly not limited to: installation of pipe, steel erection,
wood framing and CMU block construction, concrete and asphalt
placement, bridge construction, earthwork operations, foundation
installation, etc. § Responsible for maintaining positive communication
between client, the client’s representative, various municipalities,
subcontractors, vendors, community § Managed EPA compliance including erosion control and
SWPPP reporting to determine BMP’s to minimize the project’s environmental
impact § Responsible for ensuring that work was performed in
compliance with both OSHA and company safety policies § Provided technical assistance to field supervision
and craft § Generated owner/contractor contracts, subcontracts,
change orders, and payment applications § Scheduled and proactively monitored all labor and
equipment to ensure full utilization of company resources § Oversaw and directed Maintenance Of Traffic
operations serving as worksite traffic supervisor (responsibilities included
generating weekly MOT reports and traffic control plans including Interstate
closures and detour routes) on numerous projects § Managed Compliance for DOT and Federally Aided
projects (i.e. EOE, OJT Training, Certified Payroll, DBE participation
quotas, etc.) § Composed and coordinated submittals, RFI’s,
insurance cost estimates, and additional work proposals § Established and coordinated field engineering
activities with Surveyors, and the Project Management team The Mannik & Smith
Group
Toledo, OH Field Engineer
April 2003 – June
2006 § Performed construction observation & testing for
soils and concrete
placement
, steel erection, and CMU construction on multiple building
projects
§ Utilized Total Stationing & GPS survey equipment
to perform interstate / highway topographic
surveys
§ Utilized robotic survey equipment to perform
multiple bridge structure & roadway
projects
§
Performed Construction Inspection on
multiple site development projects including full CEI inspection representing
various municipalities § Monitored soil placement and compaction efforts to
insure compliance with both EPA and Contract specifications on
construction projects for both public as well as private
clientele
§ Managed and monitored multiple geosynthetic
installations / land fill cell construction projects § Performed multiple construction survey layout for
multiple site development projects (ex. of projects including but not limited
to: Airports, shopping centers, hospitals, housing developments)
J.C.
Andrus &
Associates
Toledo, OH Engineer Intern / Survey Technician
April 2001 – April 2003 § Utilized Total Stationing to produce numerous
topographic surveys for site development projects § Assisted in establishing GPS coordinate grid system
(CORS) throughout NW Ohio and SE Michigan § Generated designs based off field collected data and
created blueprints utilizing various CAD software §
Performed multiple construction
stake-outs for utility infrastructure systems such as water, storm and sewer
systems as well as building pads, roadway, and parcel
layouts